TimePeriod
Specifies a date range for retrieving efficiency metrics. The start date is inclusive and the end date is exclusive.
Contents
- end
-
The end of the time period (exclusive). Specify the date in ISO 8601 format, such as 2024-12-31.
Type: String
Required: Yes
- start
-
The beginning of the time period (inclusive). Specify the date in ISO 8601 format, such as 2024-01-01.
Type: String
Required: Yes
See Also
For more information about using this API in one of the language-specific AWS SDKs, see the following: