

# COST05-BP06 Perform continuous cost analysis
<a name="cost05-bp06"></a>

 Usage patterns shift, workloads grow, and new service options appear, so a one-time review drifts out of date. Treat cost analysis as an ongoing practice that combines forecasts, continuous monitoring, and scheduled reviews. 

 **Desired outcome:** 
+  Your workload costs stay aligned with actual usage patterns over time. 
+  You identify cost-saving opportunities as the workload evolves, not after the fact. 
+  You forecast future costs from observed usage trends. 
+  You adopt new, more cost-effective services and features on a timely basis. 

 **Common anti-patterns:** 
+  Resource allocation stays static while usage patterns change. 
+  New service offerings that could lower cost are ignored. 
+  Component choices are not reassessed as the workload scales. 
+  Auto scaling policies are left unchanged despite observed demand patterns. 

 **Benefits of establishing this best practice:** 
+  Cost optimization continues throughout the workload lifecycle. 
+  Costs stay tied to business value as the workload changes. 
+  New cost-effective services are adopted with less delay. 
+  Capacity planning and resource utilization improve. 

 **Level of risk exposed if this best practice is not established:** Medium 

## Implementation guidance
<a name="implementation-guidance"></a>

 A workload optimized at launch faces different usage six months later, and cheaper services may have launched since. Point-in-time analysis cannot catch this drift, so run cost analysis continuously. 

 Forecasting predicts cost from expected business change and usage trends. Monitoring watches actual spend and flags deviations as they occur. Scheduled reviews revisit component choices against current needs. Run all three activities, because each catches what the others miss. 

 Tie the depth of each analysis to the size of the change. A minor, steady workload rarely justifies a deep review. A large shift in usage warrants a thorough one to confirm that cost and value still align. Keep cost aligned with usage, and investigate any gap between the two. 

 Requirements shift as a workload matures. Storage volume types that fit early usage may cost more than newer options later. Compute instances chosen for one performance profile may no longer match the load. Sustained, high-volume data transfers may be cheaper over dedicated connectivity than over the paths chosen at launch. Reassess these choices regularly as the workload grows. 

### Implementation steps
<a name="implementation-steps"></a>

1.  **Define predicted usage patterns:** Work with stakeholders such as marketing and product owners to document expected and forecast usage for the workload. Discuss historical and forecast increases in cost and usage, and confirm they align with business requirements. Identify the calendar days, weeks, or months when demand rises, so you can plan capacity changes or additional services ahead of them. 

1.  **Analyze cost at each predicted usage point:** Perform analysis at the usage points you defined, scaling the effort to the size of the change. A large change in usage warrants a thorough analysis to verify the resulting costs. Confirm that cost increases track usage and business growth rather than outpacing them. 

1.  **Establish usage-pattern forecasting:** Build a systematic approach to predicting future usage. Gather insight from stakeholders across the organization, and combine historical data with predictive models to project future scenarios. Refresh the forecasts as new information and observed trends arrive. 

1.  **Implement continuous cost monitoring:** Monitor resource usage and cost across all components with [AWS Cost Explorer](https://docs.aws.amazon.com/cost-management/latest/userguide/ce-forecast.html), [AWS Data Exports](https://docs.aws.amazon.com/cur/latest/userguide/what-is-data-exports.html), [AWS Cost Anomaly Detection](https://docs.aws.amazon.com/cost-management/latest/userguide/manage-ad.html), and Amazon CloudWatch. Set alerts for significant deviations from expected cost or usage, and tune the thresholds as workload characteristics change. 

1.  **Conduct regular service evaluations:** Review new AWS services and features on a schedule, and assess their cost benefit against your workload's current and projected needs. Use a total-cost-of-ownership framework that includes migration and operational cost when you weigh a service change. 

## Resources
<a name="resources"></a>

 **Related best practices:** 
+  [COST05-BP02 Analyze all components of the workload](cost05-bp02.md) 
+  [COST07-BP01 Perform pricing model analysis](cost07-bp01.md) 
+  [COST09-BP02 Continuously review and optimize the workload](cost09-bp02.md) 

 **Related documents:** 
+  [Apply optimization recommendations using Automation](https://docs.aws.amazon.com/compute-optimizer/latest/ug/automation.html) 
+  [Amazon EC2 Auto Scaling](https://docs.aws.amazon.com/autoscaling/ec2/userguide/what-is-amazon-ec2-auto-scaling.html) 
+  [Cloud Data Migration](https://aws.amazon.com/cloud-data-migration/) 

 **Related videos:** 
+  [Maximizing cloud storage efficiency: AWS best practices for cost optimization and performance](https://aws.amazon.com/video/watch/ceaceb0bf68/) 
+  [AWS re:Invent 2025 - Advanced analytics with AWS Cost and Usage Reports](https://www.youtube.com/watch?v=shJvrQNn6Ec) 
+  [Getting Started with AWS Cost Optimization Hub](https://www.youtube.com/watch?v=YJWghp6tlYg) 

 **Related examples:** 
+  [Optimizing your Kubernetes compute costs with Karpenter consolidation](https://aws.amazon.com/blogs/containers/optimizing-your-kubernetes-compute-costs-with-karpenter-consolidation/) 